1 Comment
Infrastructure Minister Liz Kimmins is pictured with some of the DFI’s road crews who have made 10,000 repairs to the road network over the last eight weeks.
Infrastructure Minister Liz Kimmins is pictured with some of the DFI’s road crews who have made 10,000 repairs to the road network over the last eight weeks.

Infrastructure Minister Liz Kimmins has announced that more than 10,000 road defects have been repaired throughout the north in just eight weeks. The repairs have been carried out under the Winter Recovery Road Fund, which the Minister established specifically to address roads worst affected by prolonged bad weather at the start of the year.

Praising the crews who have been working on local roads, Minister Kimmins said: "The damage caused to our roads by prolonged bad weather at the beginning of the year is well documented and I established the Winter Recovery Road Fund to specifically address the areas which were worst affected."

She added that following her announcement of additional funding, road crews had been working hard, with the results now clear. "Now the figures speak for themselves, with 10,000 repairs completed in eight weeks," she said.

The Minister acknowledged that the work is far from finished, pointing to years of underfunding as a factor in the overall condition of the road network. "We are not complacent and there is still much to do because the overall condition of the network has suffered because of years of underfunding by the British Government," she said, adding that she was nonetheless pleased the ringfenced funding was "making a real and tangible difference across the North."

Alongside the repair programme, Minister Kimmins has published a draft Road Maintenance Strategy which sets out a new approach to road maintenance, making use of modern technology to direct investment where it is most needed. The strategy also looks to future-proof the road network to meet changing needs, including active travel, reducing the carbon footprint of road operations, and ensuring the network can withstand adverse weather events.

While there is more to do the Minister has emphasised that even the smallest fix matters. "We all use our roads and even the smallest repair can have a big impact when it comes to better journeys for drivers, cyclists and pedestrians," she said.

Loading comment... The comment will be refreshed after 00:00.
Say something here...
or post as a guest

LATEST PHOTOS

Newry Mela
Tuesday, 08 September 2026
Newry Mela
Images: 20
Hits: 159
Royal Black Institution Black Saturday parade in Newry
Sunday, 30 August 2026
Royal Black Institution Black Saturday parade in Newry
Images: 185
Hits: 2709
Newry Pride 2026
Monday, 24 August 2026
Newry Pride 2026
Images: 91
Hits: 1145
GCSE Results 2026
Thursday, 20 August 2026
GCSE Results 2026
Images: 43
Hits: 631
A Level Results Day Newry 2026
Thursday, 13 August 2026
A Level Results Day Newry 2026
Images: 22
Hits: 736

EVENTS CALENDAR

September   2026
M T W T F S S
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30        
   
0
Shares