Write a comment
The proposed active travel route will link Warrenpoint with the Carlingford Lough Greenway via the Narrow Water Bridge. Photograph: Columba O'Hare/ Newry.ie
The proposed active travel route will link Warrenpoint with the Carlingford Lough Greenway via the Narrow Water Bridge. Photograph: Columba O'Hare/ Newry.ie

Proposals underway for an active travel route from the centre of Warrenpoint to the site of the Narrow Water Bridge  will require a "reallocation of road space" along the route. That's according to Infrastructure Minister Liz Kimmins in reply to a question from South Down MLA Diane Forsythe.

The project being forwarded by the Department for Infrastructure is part of a plan to connect the town safely for cyclists and walkers with the existing Carlingford Lough Greenway.

Diane Forsythe MLA
Diane Forsythe MLA

Forsythe had tabled a question asking for an update on the proposed active travel and greenway scheme, following what she said were rumours circulating regarding plans to reduce the Newry Road out of Warrenpoint past the docks from four lanes to two for the project.

Forsythe said: "This is an incredibly busy road which already faces huge pressures, heavy vehicles and congestion. Reducing the number of lanes will have a huge impact, especially is [sic] the bridge brings the increase in visitors that many hope for.

"We have seen millions of pounds spent on these schemes whilst the roads are falling apart with severe potholes, like the scheme currently under development from Dundrum to Clough.  Is this the best way to prioritise spending this money?"

In reply Minister Kimmins confirmed that proposals to improve pedestrian and cycling infrastructure on the A2 Newry Road between Warrenpoint and the new Narrow Water Bridge are currently being developed.

"This forms part of a broader initiative aimed at increasing active travel provision in the area to unlock benefits associated with improved connectivity to Newry and the Carlingford Greenway." she said.

Kimmins added: "These improvements will require a reallocation of road space along the corridor to provide safe, high quality cycling infrastructure. Officials are cognisant of concerns about the capacity of the road network, which will be considered as part of the design process."

The Minister has emphasised that there will be public engagement for the community, businesses, and other key stakeholders in the coming months.

Loading comment... The comment will be refreshed after 00:00.
Say something here...
or post as a guest

LATEST PHOTOS

SOS Daisy Hill Hospital Rally in Newry
Tuesday, 27 October 2026
SOS Daisy Hill Hospital Rally in Newry
Images: 48
Hits: 228
Abbey CBS production of Jesus Christ Superstar 2026
Saturday, 24 October 2026
Abbey CBS production of Jesus Christ Superstar 2026
Images: 108
Hits: 680
Armagh County Final 2026 - Crossmaglen v Killeavy
Monday, 19 October 2026
Armagh County Final 2026 - Crossmaglen v Killeavy
Images: 66
Hits: 613
Launch of the Rural Heritage of South Armagh Project in Cullyhanna
Monday, 05 October 2026
Launch of the Rural Heritage of South Armagh Project in Cullyhanna
Images: 9
Hits: 380
Greater Newry Business Awards 2026
Sunday, 27 September 2026
Greater Newry Business Awards 2026
Images: 24
Hits: 570

EVENTS CALENDAR

November   2026
M T W T F S S
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30            
   
0
Shares